Group Company Winning Project

 

 

Method Name

Award Time

Construction Method Number

Approval Document

Authority

1 Hoisting construction method of waste-to-energy incinerator based on BIM modeling technology 2018-07 EJGF37-2018

Yu Jianxie[2018]34

Henan Construction Industry Association

2 Construction method of copper clad steel grounding grid based on CATIA optimization 2018-07 EJGF38-2018 Yu Jianxie[2018]34 Henan Construction Industry Association

3

Fixed dip angle mountain photovoltaic support installation method

2017-07

EJGF15-2017

Yu Jianxie[2017]45

Henan Construction Industry Association

4

Gypsum board production line roller road and flap equipment installation construction method

2016-09

EJGF13-2016

Yu Jianxie[2016]66

Henan Construction Industry Association

5

Construction method of urban heating bulk gas hot water boiler

2015-06

EJGF25-2015

Yu Jianxie[2015]64

Henan Construction Industry Association

6

Mobile winch traction laying cable construction method

2015-06

EJGF26-2015

Yu Jianxie[2015]64

Henan Construction Industry Association

7

Float glass trough steel structure installation construction method

2014-08

EJGF39-2014

Yu Jianxie[2014]88

Henan Provincial Construction Department

8

Float glass furnace large arch construction method

2013-01

EJGF09-2006(2012Annual upgrade-001)

Yu Jianxie[2013]05

Henan Provincial Construction Department

9

Glass fiber production line access steel structure installation construction method

2011-03

EJGF45-2011

Yu Jianxie[2011]25

Henan Provincial Construction Department

10

Rotary kiln transmission installation construction method

2011-03

EJGF123-2010

Yu Jianxie[2011]24

Henan Provincial Construction Department

11

High pressure reciprocating compressor construction method

2009-04

15-2008

Yu Jianxie[2009]38

Henan Provincial Construction Department

12

Installation and construction method of cement waste heat power generation equipment

2008-03

EJGF16-2007

Yu Jianxie[2008]34

Henan Provincial Construction Department

13

Construction method of tin tank masonry for float glass production line

2006-12

EJGF08-2006

Yu Jianxie[2006]277

Henan Provincial Construction Department

14

Float glass furnace kiln arching construction method

2006-12

EJGF09-2006

Yu Jianxie[2006]277

Henan Provincial Construction Department

15

Construction method of mixing stacker and reclaimer for dry cement production line

2006-12

EJGF10-2006

Yu Jianxie[2006]277

Henan Provincial Construction Department

16

CRT glass bulb construction method

2003-12

First prize

Yu Jianxie[2003]106

Henan Provincial Construction Department

17

Circulating fluidized bed (CFB) boiler installation method

2003-12

First prize

Yu Jianxie[2003]106

Henan Provincial Construction Department

18

Glass shell melting furnace steel structure fabrication and installation method

2003-12

Third prize

Yu Jianxie[2003]106

Henan Provincial Construction Department

19

Float glass annealing kiln and roller road installation method

1996-09

EJGF15-1996

Yu Jianxie[1996]53

Henan Provincial Construction Department

20

Glass furnace vault construction method (national construction method)

1993-09

YJGF-53-92

Shi Jian[1993]50

Ministry of Construction